top of page
Asphalt
Concrete Texture

Our Work

20220110_100912_edited.jpg
20220127_103841_edited.jpg
20220127_103757_edited.jpg

01

Agitator Truck Refurbishment

Refurbishment of agitators - chassis & barrel renewal

02

Barrel Refurbishments

When Marleston Pty Ltd refurbishes a barrel - not only the external aspects get a make-over, but the internal components too. Works to completed include: barrel, blade, capping, de-dagging & repair work with sandblasting & painting.

The before pictures to the right with post refurbishment pictures to be taken and posted.

_edited_edited.jpg
20220503_125723_edited.jpg
Asphalt
3_edited.jpg
2_edited_edited.jpg

03

Silo Base Air Matting

These pictures are from Murray Bridge with the lads replacing the silo base air matting. 

 

04

Project Name

This is your Project description. Provide a brief summary to help visitors understand the context and background of your work. Click on "Edit Text" or double click on the text box to start.

  • Facebook

©2021 by Marleston. Proudly created with Wix.com

bottom of page